![](https://ferrano.co.uk/wp-content/uploads/2022/11/cs_banner-4.jpg)
Case Studies
![](https://ferrano.co.uk/wp-content/uploads/2022/11/blog_1_bnr-2.png)
Marylebone Square, London
- Kier Construction
- 206 Bathrooms
- Walnut Veneer Carcase with curved corners & 20mm Polished Marble Top
- All vanities pre-fabricated offsite including undermount bowls connected and pre-plumbed, ensuring a seamless installation onto the Ferrano frames installed by the recommended installer.
![](https://ferrano.co.uk/wp-content/uploads/2022/11/blog_2_bnr-2.png)